Testimonials

Contract: Investec Wealth & Investment

Contract Period: 32 weeks (phased)

Contract Value: £900k

This project required that the complete refurbishment and M & E installation work was completed in separate phases over three floors while maintaining the client’s business on site at all times; having worked with the THWG team before I knew that I would be able to count on their professionalism and commitment to this project which required a conscious awareness and concerted effort to ensure that the client’s business remained unaffected for the duration of the works. Both the client and I were not disappointed; the finished project has been completed to a high standard and within the required time constraints.

by Design Director A C Liani ( Yorkshire ) Limted ( 10th July 2012 )

Contract The Blue Boar Hotel 

Contract Period 18 weeks 

Contract Value £1.4 million

The team have a great attitude and are there to solve problems, not create them. I've been impressed by the quality of their building and joinery work and by their commitment to deliver a great end result for the client.   They take time time to understand exactly what is required whilst maintaining a sense of urgency. 

by Director of Design ( 27th March 2012 )

Contract Zizzi Harrogate

Contract Period 12 weeks 

Contract Value £397,000


THWG demonstrated an extraordinary ability to deal with and actively solve any problems that arose during fit-out of a particularly difficult building. All works were conducted in a thorough manner, and the enthusiasm with which they approached all jobs on site showed that they are willing to go above and beyond expectations to provide the best for their client.  The attention to detail and quality of the finished unit was very impressive, as was the use of CAD systems to model any difficult details or joinery items. This became invaluable given the distance of the job from our offices as the tight deadlines approached, all of which were met by THWG with the minimum of fuss. All in all, this was a most satisfactory job, in no small part down to the professional approach of THWG. I very much look forward to working with them again on forthcoming projects.

by Senior Designer Dover Design

Contract Zizzi Shrewsbury

Contract Period 8 Weeks

Contract Value £260,000

Working with THWG on this project  has been a wholly positive experience and example of the best in team working. Every member of their team has been enthusiastic and positive even when facing seemingly insurmountable difficulties and deadlines.  When problems presented they were eager to present solutions and remained sensitive to design considerations throughout.

I am particularly impressed by their embracing of the latest internet based communications technology to keep their entire team abreast of revisions in design and drawings during the course of the works.

I am happy to recommend them and look forward to working with them in the future.

by Project manager Dover Design 28th March 2012

 

Contract Zizzi The Light Leeds

Contract Period 8 Weeks

Contract Value £270,000

Dave has always provided an excellent service and his latest effort showed that he is still striving (and suceeding) in offering the very best for his Clients. I was immensely impressed with the attention to detail and the focus on quality that all at THWG demonstrated. If you are a retailer looking to expand your pool of contractors, I would strongly recommend you look in the direction of THWG.

by Development Manager , Gondola Group Ltd 27th May 2011

 

Contract : Cloverleaf Cramlington

Contract Period : 9 Weeks 

Conract Value : £330,000

Nothing has been too much trouble for them (or anyone else at THWG) and the teams positive, wholehearted, personable and customer focused approach of "just getting on with things and getting the job done", has resulted in extremely positive feedback from the management team, the main contractor and our direct contractors and suppliers alike.

I look forward to working with the THWG team again on forthcoming projects.

by Director, Cloverleaf Restaurants Ltd. 4th November 2010

 

Various Leisure Contracts over a 14 year span

Used to managing a large and complex site operation while working to tight deadlines. Communicates well with Clients and the design team. Rarely has a problem been reported without suggesting a feasible solution.

I look forward to working together again.

by Mike Bower, Bower Design,

Recent Contracts

ZIZZI WEMBLEY
LONDON DESIGNER OUTLET

ZIZZI KING ST MANCHESTER
SHORTLISTED FOR THE RESTAURANT & BAR DESIGN AWARDS 2016

THE AIRPORT ( MANCHESTER )
RESTAURANT BAR DESIGN AWARDS WINNER 2015

REVOLUTION STAFFORD
FIT OUT CONTRACT 9 WEEKS IN STAFFORD

ZIZZI LEEDS THE LIGHT
RESTAURANT & BAR DESIGN AWARDS WINNER 2012

WILDWOOD WORCESTER
9 WEEK FIT OUT PROJECT IN WORCESTER

BREWDOG NORWICH
12 WEEK STRUCTURAL AND REFURBISHMENT PROJECT

MUSE UPPERMILL
14 WEEK MAJOR STRUCTURAL / EXTENSION / REFURBISHMENT

Contact Us

 

THWG LTD

BLOCK B

GATEHEAD BUSINESS PARK

DELPH NEW ROAD

DELPH

OLDHAM

GREATER MANCHESTER

OL3 5DE